Got some braiding and some elevation changes done this weekend. 7 of the 11 pieces have
braid 
in all three lanes. 1 other track piece is taped and ready for
braid 
.

The lower track got some elevation making it uphill to the middle of the corner and then downhill into the next corner.

This corner is at the bottom of the downhill cuve in previous photos. This turn exits and goes uphill to next corner.

small blocks attached to the sides of the track to provide areas to attach tile board guard rails.

tile board cut into 4" tall 4' long strips and painted with a coat of red paint. These will be guard rails ready for some geezer banners.

extra plywood attached in corner for a sand trap / kitty litter area with tires and fence.